ScopeGrade

How to compare contractor quotes fairly

Comparing totals only works when the quotes describe the same job. Here's how to line them up scope-first, so the price difference means something.

ScopeGrade EditorialWritten with working contractors2 min read

Three quotes side by side, compared line by line: two include every scope item, one is missing two.Quote A$14.2kQuote B$18.9kQuote C$22.5k

Three quotes come back: $14,200, $18,900 and $22,500. The natural instinct is to look at the middle one and wonder whether the cheap one is a bargain. But until you know the three quotes describe the same work, the totals don't tell you much at all.

Step 1: make sure everyone quoted the same thing

Differences in scope are the most common reason quotes differ. Before comparing prices, line the quotes up item by item:

Three quotes side by side, compared line by line: two include every scope item, one is missing two.Quote A$14.2kQuote B$18.9kQuote C$22.5k
Line quotes up by scope item, not by total.
Scope itemQuote A — $14,200Quote B — $18,900Quote C — $22,500
Excavation & disposalIncludedIncludedIncluded
Base depthNot stated6″ compacted8″ compacted
Pavers“Interlock”Named product & colourNamed product & colour
Edge restraintNot mentionedIncludedIncluded
Lawn restorationExcludedIncludedIncluded
Warranty1 year3 years5 years
An example comparison — the cheapest quote is missing two items

Step 2: ask each contractor to fill the gaps

Send each contractor the same short list of questions for anything missing or unclear: base depth, product names, what's excluded, how changes are priced. A careful contractor will answer quickly. The answers often move the cheap quote up — or reveal that it was simply a different, smaller job.

Step 3: compare like with like

  • Normalise allowances. If one quote has a $1,000 allowance for drainage and another includes drainage outright, compare them with the allowance used in full.
  • Check quantities. 400 sq ft and 432 sq ft of patio aren't the same job.
  • Compare warranties and payment terms, not just price. A big deposit up front carries more risk than payments tied to progress.
  • Weigh the timeline. Starting in three weeks and starting next spring are different offers.

Step 4: then compare price — and the contractor

Once the scope matches, price differences are real and fair to compare. At that point, the cheapest quote may well be the right choice. Weigh it alongside how clearly each contractor explained their work, their references and insurance, and how they answered your questions.